docs: Phase 26 complete, Phase 27 ready — 7 feature candidates

This commit is contained in:
Mathieu Moran
2026-08-11 18:20:07 -04:00
parent 341437c2d4
commit f017a301f3
+9 -13
View File
@@ -1909,21 +1909,17 @@ BUG-02 is hardware (Pi micro-USB port damage) — owner's responsibility.
--- ---
### Phase 27: Feature additions — 🚧 PLANNED ### Phase 27: Feature additions — 🚧 UP NEXT (pick one)
**New phase added 2026-08-11.** Collects all feature requests from [FEATURES.md](./FEATURES.md) **Phase 26 is complete.** Select a feature from [FEATURES.md](./FEATURES.md) to implement.
that aren't bug fixes. Implemented after Phase 26 bug fixes are done, before the Android app.
Current candidates: Current candidates:
- **FEAT-01**: Parallel/concurrent chunked dashcam uploads 1. **FEAT-01**: Parallel/concurrent chunked dashcam uploads
- **FEAT-02**: QR / claim-code device pairing flow 2. **FEAT-02**: QR / claim-code device pairing flow
- **FEAT-03**: Manual start odometer fallback 3. **FEAT-03**: Manual start odometer fallback
- **FEAT-04**: Replace SIM868 2G GSM hat with 4G LTE modem (Huawei E3372h-153) 4. **FEAT-04**: Replace SIM868 2G GSM with 4G LTE modem (Huawei E3372h-153)
- **FEAT-05**: DTC history synced to remote server with code descriptions 5. **FEAT-05**: DTC history synced to remote server with code descriptions
- **FEAT-08**: Predictable IP on phone hotspot (DHCP reservation / static IP) 6. **FEAT-08**: Predictable IP on phone hotspot (DHCP reservation / static IP)
- **FEAT-09**: mDNS (yaris.local) on phone hotspot 7. **FEAT-09**: mDNS (yaris.local) on phone hotspot
See [FEATURES.md](./FEATURES.md) for full details on each. Features are picked up one at a time
and marked `IN PROGRESS` → `SHIPPED` as they land.
### Phase 28: Native Android companion app — 🚧 PLANNED (low priority, always last) ### Phase 28: Native Android companion app — 🚧 PLANNED (low priority, always last)
**Renumbered from former Phase 26 on 2026-08-10 to make room for the road-test bug-fix phase. Renumbered to Phase 28 on 2026-08-11 to make room for Phase 27 feature additions.** **Renumbered from former Phase 26 on 2026-08-10 to make room for the road-test bug-fix phase. Renumbered to Phase 28 on 2026-08-11 to make room for Phase 27 feature additions.**