Document dashcam browser completion
Co-authored-by: Copilot <[email protected]>
This commit is contained in:
@@ -42,7 +42,8 @@ i have a dream
|
||||
port number)
|
||||
- 🎥 **Dashcam file retrieval** — detects a USB dashcam automatically (any brand/folder layout,
|
||||
no hardcoded device path), mounts it read-only, and safely copies footage locally. Verified
|
||||
against a real 28GB/87-file import
|
||||
against a real 28GB/87-file import. The web UI can also browse, sort, and delete individual or
|
||||
all videos directly from the connected dashcam with confirmed, temporary read-write operations
|
||||
- ☁️ **Remote upload** — a self-hosted server (Flask + Postgres, `server/`) receives trip/GPS
|
||||
logs and dashcam footage over the internet (via Cloudflare Tunnel or a plain port-forward).
|
||||
Dashcam videos upload in resumable 40MB chunks (works around tunnel body-size limits and keeps
|
||||
@@ -87,7 +88,7 @@ For the remote server (receives trip logs + dashcam uploads), see [server/README
|
||||
|
||||
## Project status
|
||||
|
||||
This project was revived after a couple of years on the shelf. Phases 1-13 and 15 are complete:
|
||||
This project was revived after a couple of years on the shelf. Phases 1-13 and 15-16 are complete:
|
||||
real GNSS, hardened OBD support, offline maps/UI, automatic WiFi hotspot switching, local logging,
|
||||
dashcam import, resumable remote upload, deployment, and the shared UI foundation are implemented.
|
||||
The pipeline has been exercised on the real Pi and dashcam, including a complete 28GB import and
|
||||
@@ -99,6 +100,6 @@ partition, and clean shutdown still needs delayed-power or ignition-sense hardwa
|
||||
|
||||
The browser-based phone relay was removed after real-world testing confirmed that mobile browsers
|
||||
cannot reliably use the Pi's WiFi and cellular data simultaneously. A native Android companion is
|
||||
planned later instead. The next roadmap work is the dashcam/local-video browsers, followed by trip
|
||||
history, Pi health, alerts, settings, and a final UI polish pass. Full phase history, verification
|
||||
notes, and current scope live in [PLAN.md](./PLAN.md).
|
||||
planned later instead. The next roadmap work is the local imported-video browser/player, followed by trip history, Pi
|
||||
health, alerts, settings, and a final UI polish pass. Full phase history, verification notes, and
|
||||
current scope live in [PLAN.md](./PLAN.md).
|
||||
|
||||
Reference in New Issue
Block a user